Stud Walls - Fitting Pipes Sheffield

A diy guide to fitting pipes into the noggins and studs of stud or partition walls. If you are planning to construct a stud wall to create a bathroom, for example, you might need to fit plumbing behind the plasterboard. This is fairly easy to do, as long as yoiu remember a few simple rules.

Crosspool Hardware
0114 2681327
54A Sandygate Road
Sheffield
E Turley
0114 2686357
Vale Stores
Sheffield
Magnet Ltd
0114 2706268
3 Queens Road
Sheffield
Anglian Home Improvements
0800 825 0387
14 Fitzwilliam Gate
Sheffield
Hand It To You
0114 2442710
453 Firth Park Road
Sheffield
S W Williamson & Son Ltd
0114 2661911
222 Fulwood Road
Sheffield
Homestyle Home Improvements
0114 2320654
97 Greaves Lane
Sheffield
Sheffix Hardware Merchants
0114 2729974
248 Shoreham Street
Sheffield
Askham Home Improvements Ltd
0114 2557947
415 London Road
Sheffield
Stannington Hardware
0114 2340241
658 Stannington Road
Sheffield
Data Provided by:
 

Stud Walls - Fitting Pipes

If you are planning to construct a stud wall to create a bathroom, for example, you might need to fit plumbing behind the plasterboard. This is fairly easy to do, as long as yoiu remember a few simple rules.

Height

Installing pipework behind plasterboard takes a bit of thought. At some point in the future you, or future occupants of your house, might want to drill into the wall to hang shelves, etc. Bear this in mind and make sure any horizontal pipework stays lower then 300mm from the floor level. This will drastically reduce the chance of hitting the pipe when drilling at a later date.

Planning and Marking

Plan out carefully where the pipework will need to run and mark the studs or noggins where it passes them. Keep in mind that waste pipes need a slight fall along their horizontal length. Transfer the marks around to the side of the studs or noggins.

Cutting Notches

To create a notch for a standard copper water pipe, take a drill bit slightly larger than the pipe and drill through the studs and noggins, close to the front face. Cut into the stud or noggin from the front to create a notch. For waste pipes, which obviously require a larger notch, again take a drill bit slightly larger than the pipe and drill through the middle of the stud or noggin. Before cutting into the hole from the front of the timber to create the notch, cut a 300mm by 25mm section out of the front of the stud. Once the waste pipe is in place, you can screw or nail a 300mm strip of 25x50mm timber to strengthen the stud.

Click here to read more from DIY Extra