Stud Walls - Fitting Pipes Kingston

A diy guide to fitting pipes into the noggins and studs of stud or partition walls. If you are planning to construct a stud wall to create a bathroom, for example, you might need to fit plumbing behind the plasterboard. This is fairly easy to do, as long as yoiu remember a few simple rules.

Charles Sirrell & Son Ltd
020 89773440
208 Kingston Road
Teddington
Magnet Ltd
020 85411633
6 Fairfield Industrial Estate
Kingston Upon Thames
Universal Hardware Direct Uk Ltd
020 86051087
Unit 98 Kingspark Business Centre
New Malden
Anglian Home Improvements
0800 825 0387
Tolworth Broadway
Surbiton
Hampton Hill Hardware
020 89439919
64 High Street
Hampton
Hardwareability Computer Systems
020 85473600
Endeavour House
Kingston Upon Thames
Magnet Ltd
020 89745949
91 Clarence Street
Kingston Upon Thames
Teddington Hardware
020 89771324
119A High Street
Teddington
Hexagon Home Improvements
020 89778060
1 Allbrook Close
Teddington
Crossys Home & Garden
020 83982828
Manor Road North
Esher
Data Provided by:
 

Stud Walls - Fitting Pipes

If you are planning to construct a stud wall to create a bathroom, for example, you might need to fit plumbing behind the plasterboard. This is fairly easy to do, as long as yoiu remember a few simple rules.

Height

Installing pipework behind plasterboard takes a bit of thought. At some point in the future you, or future occupants of your house, might want to drill into the wall to hang shelves, etc. Bear this in mind and make sure any horizontal pipework stays lower then 300mm from the floor level. This will drastically reduce the chance of hitting the pipe when drilling at a later date.

Planning and Marking

Plan out carefully where the pipework will need to run and mark the studs or noggins where it passes them. Keep in mind that waste pipes need a slight fall along their horizontal length. Transfer the marks around to the side of the studs or noggins.

Cutting Notches

To create a notch for a standard copper water pipe, take a drill bit slightly larger than the pipe and drill through the studs and noggins, close to the front face. Cut into the stud or noggin from the front to create a notch. For waste pipes, which obviously require a larger notch, again take a drill bit slightly larger than the pipe and drill through the middle of the stud or noggin. Before cutting into the hole from the front of the timber to create the notch, cut a 300mm by 25mm section out of the front of the stud. Once the waste pipe is in place, you can screw or nail a 300mm strip of 25x50mm timber to strengthen the stud.

Click here to read more from DIY Extra