Stud Walls - Fitting Pipes Edinburgh

A diy guide to fitting pipes into the noggins and studs of stud or partition walls. If you are planning to construct a stud wall to create a bathroom, for example, you might need to fit plumbing behind the plasterboard. This is fairly easy to do, as long as yoiu remember a few simple rules.

Marchmont Hardware
0131 6676389
8 Warrender Park Road
Edinburgh
Dronax Computers
0131 6560377
97-101 Morrison Street
Edinburgh
Tip Top Home Improvements
0131 3460510
1F2 5 Henderson Terrace
Edinburgh
R Imrie
0131 3371849
202 Dalry Road
Edinburgh
E H S Architectural Ltd
0131 4441149
49 Lanark Road
Edinburgh
Houseproud Of Morningside
0131 4529012
169 Morningside Road
Edinburgh
All Hands Services
07950 163997
15 Home Street
Edinburgh
Living Design Home Improvements
0800 200777
Westfield Avenue
Edinburgh
City Hardware Ltd
0131 6521245
6B King'S Haugh
Edinburgh
Tip Top Home Improvement
0131 4436487
40 Chesser Loan
Edinburgh
Data Provided by:
 

Stud Walls - Fitting Pipes

If you are planning to construct a stud wall to create a bathroom, for example, you might need to fit plumbing behind the plasterboard. This is fairly easy to do, as long as yoiu remember a few simple rules.

Height

Installing pipework behind plasterboard takes a bit of thought. At some point in the future you, or future occupants of your house, might want to drill into the wall to hang shelves, etc. Bear this in mind and make sure any horizontal pipework stays lower then 300mm from the floor level. This will drastically reduce the chance of hitting the pipe when drilling at a later date.

Planning and Marking

Plan out carefully where the pipework will need to run and mark the studs or noggins where it passes them. Keep in mind that waste pipes need a slight fall along their horizontal length. Transfer the marks around to the side of the studs or noggins.

Cutting Notches

To create a notch for a standard copper water pipe, take a drill bit slightly larger than the pipe and drill through the studs and noggins, close to the front face. Cut into the stud or noggin from the front to create a notch. For waste pipes, which obviously require a larger notch, again take a drill bit slightly larger than the pipe and drill through the middle of the stud or noggin. Before cutting into the hole from the front of the timber to create the notch, cut a 300mm by 25mm section out of the front of the stud. Once the waste pipe is in place, you can screw or nail a 300mm strip of 25x50mm timber to strengthen the stud.