Stud Walls - Fitting Pipes Coventry

A diy guide to fitting pipes into the noggins and studs of stud or partition walls. If you are planning to construct a stud wall to create a bathroom, for example, you might need to fit plumbing behind the plasterboard. This is fairly easy to do, as long as yoiu remember a few simple rules.

Foreys Hardware
024 76687513
527-529 Foleshill Road
Coventry
Magnet Ltd
02476 634704
Foleshill Road
Coventry
Warwickshire Home Improvements Ltd
02476 527710
The Meridian, 4 Copthall House
Coventry
D & M Discount
024 76503235
131 Daventry Road
Coventry
Adorn Roofing & Home Improvement Services
024 76621178
359 Ansty Road
Coventry
Bright Light Home Improvements
024 76332644
92A Dickens Road
Coventry
Aphidavid Ltd
024 76227227
Phillips Place
Coventry
G D R Home Improvements
024 76596229
28 Treherne Road
Coventry
Range
024 76667309
Austin Drive
Coventry
Sb Property Services
02476 677451
8 Turner Road, Chapelfields, Coventry, Warwickshire
Coventry
Data Provided by:
 

Stud Walls - Fitting Pipes

If you are planning to construct a stud wall to create a bathroom, for example, you might need to fit plumbing behind the plasterboard. This is fairly easy to do, as long as yoiu remember a few simple rules.

Height

Installing pipework behind plasterboard takes a bit of thought. At some point in the future you, or future occupants of your house, might want to drill into the wall to hang shelves, etc. Bear this in mind and make sure any horizontal pipework stays lower then 300mm from the floor level. This will drastically reduce the chance of hitting the pipe when drilling at a later date.

Planning and Marking

Plan out carefully where the pipework will need to run and mark the studs or noggins where it passes them. Keep in mind that waste pipes need a slight fall along their horizontal length. Transfer the marks around to the side of the studs or noggins.

Cutting Notches

To create a notch for a standard copper water pipe, take a drill bit slightly larger than the pipe and drill through the studs and noggins, close to the front face. Cut into the stud or noggin from the front to create a notch. For waste pipes, which obviously require a larger notch, again take a drill bit slightly larger than the pipe and drill through the middle of the stud or noggin. Before cutting into the hole from the front of the timber to create the notch, cut a 300mm by 25mm section out of the front of the stud. Once the waste pipe is in place, you can screw or nail a 300mm strip of 25x50mm timber to strengthen the stud.