Stud Walls - Fitting Pipes Bristol

A diy guide to fitting pipes into the noggins and studs of stud or partition walls. If you are planning to construct a stud wall to create a bathroom, for example, you might need to fit plumbing behind the plasterboard. This is fairly easy to do, as long as yoiu remember a few simple rules.

Active Home Improvements
0117 9426565
52 Salisbury Road
Bristol
Clifton Hardware
0117 9706260
19 Regent Street
Bristol
Wilkinson Hardware Stores Ltd
0117 9720742
Broadwalk Shopping Centre
Bristol
Highbury Home Improvements
07949 183459
30 Highbury Road
Bristol
Bishopston Hardware
0117 9401525
211-211A Gloucester Road
Bristol
Cotham Hardware
0117 9735687
11 Cotham Hill
Bristol
Anglian Home Improvements
0800 825 0387
24 Bond Street
Bristol
Robert Dyas Ltd
0117 9294484
18-19 Castle Gallery
Bristol
K J Hardware & Fancy Goods
0117 9550863
100 Stapleton Road
Bristol
Project Hardware Ltd
0117 9351212
Maze Street
Bristol
Data Provided by:
 

Stud Walls - Fitting Pipes

If you are planning to construct a stud wall to create a bathroom, for example, you might need to fit plumbing behind the plasterboard. This is fairly easy to do, as long as yoiu remember a few simple rules.

Height

Installing pipework behind plasterboard takes a bit of thought. At some point in the future you, or future occupants of your house, might want to drill into the wall to hang shelves, etc. Bear this in mind and make sure any horizontal pipework stays lower then 300mm from the floor level. This will drastically reduce the chance of hitting the pipe when drilling at a later date.

Planning and Marking

Plan out carefully where the pipework will need to run and mark the studs or noggins where it passes them. Keep in mind that waste pipes need a slight fall along their horizontal length. Transfer the marks around to the side of the studs or noggins.

Cutting Notches

To create a notch for a standard copper water pipe, take a drill bit slightly larger than the pipe and drill through the studs and noggins, close to the front face. Cut into the stud or noggin from the front to create a notch. For waste pipes, which obviously require a larger notch, again take a drill bit slightly larger than the pipe and drill through the middle of the stud or noggin. Before cutting into the hole from the front of the timber to create the notch, cut a 300mm by 25mm section out of the front of the stud. Once the waste pipe is in place, you can screw or nail a 300mm strip of 25x50mm timber to strengthen the stud.