Stud Walls - Fitting Pipes Bradford

A diy guide to fitting pipes into the noggins and studs of stud or partition walls. If you are planning to construct a stud wall to create a bathroom, for example, you might need to fit plumbing behind the plasterboard. This is fairly easy to do, as long as yoiu remember a few simple rules.

Handyman Stores
0113 2504651
14 Kirk Lane
Leeds
Priceguard Hardware Merchants
01274 585666
20-22 Westgate
Shipley
Wilkinson Hardware Stores
01274 581226
23-25 Kirkgate
Shipley
Tim Rowbotham
01274 584405
49 Bradford Road
Shipley
Jean'S Hardware
01274 632060
6 Fagley Road
Bradford
Magnet Ltd
01943 879631
White Cross
Leeds
Burhani Hardware 2
01274 632117
53 Swain House Road
Bradford
Eye Catcher Home Improvements
01274 627056
372A Otley Road
Bradford
Glyn Webb Home Improvements
01274 722122
Kings Road
Bradford
Homeconomy Hardware Merchants
0113 2565876
103 Town Street
Pudsey
Data Provided by:
 

Stud Walls - Fitting Pipes

If you are planning to construct a stud wall to create a bathroom, for example, you might need to fit plumbing behind the plasterboard. This is fairly easy to do, as long as yoiu remember a few simple rules.

Height

Installing pipework behind plasterboard takes a bit of thought. At some point in the future you, or future occupants of your house, might want to drill into the wall to hang shelves, etc. Bear this in mind and make sure any horizontal pipework stays lower then 300mm from the floor level. This will drastically reduce the chance of hitting the pipe when drilling at a later date.

Planning and Marking

Plan out carefully where the pipework will need to run and mark the studs or noggins where it passes them. Keep in mind that waste pipes need a slight fall along their horizontal length. Transfer the marks around to the side of the studs or noggins.

Cutting Notches

To create a notch for a standard copper water pipe, take a drill bit slightly larger than the pipe and drill through the studs and noggins, close to the front face. Cut into the stud or noggin from the front to create a notch. For waste pipes, which obviously require a larger notch, again take a drill bit slightly larger than the pipe and drill through the middle of the stud or noggin. Before cutting into the hole from the front of the timber to create the notch, cut a 300mm by 25mm section out of the front of the stud. Once the waste pipe is in place, you can screw or nail a 300mm strip of 25x50mm timber to strengthen the stud.