Stud Walls - Fitting Pipes Birmingham

A diy guide to fitting pipes into the noggins and studs of stud or partition walls. If you are planning to construct a stud wall to create a bathroom, for example, you might need to fit plumbing behind the plasterboard. This is fairly easy to do, as long as yoiu remember a few simple rules.

Branch Bmn Ltd
0121 3334120
153 Dollman Street
Birmingham
Plumbing Hardware Diy Centre
0121 7666488
612 Coventry Road
Birmingham
Rozia Hardware
0121 6225266
St. Martins Market
Birmingham
Mackinnon & Bailey
0121 6432233
119 Floodgate Street
Birmingham
R K Home Improvements
0121 7724622
5 Heybarnes Road
Birmingham
Saifee Hardware
0121 4404188
545 Moseley Road
Birmingham
Architectural Supplies Lowndes Ltd
0121 7725271
51 Auckland Road
Birmingham
R & R
0121 3596581
29 Revesby Walk
Birmingham
Leeway Home Improvements Ltd
0121 6666369
Keys Court
Birmingham
Woodbridge Hardware
0121 4491551
35 Woodbridge Road
Birmingham
Data Provided by:
 

Stud Walls - Fitting Pipes

If you are planning to construct a stud wall to create a bathroom, for example, you might need to fit plumbing behind the plasterboard. This is fairly easy to do, as long as yoiu remember a few simple rules.

Height

Installing pipework behind plasterboard takes a bit of thought. At some point in the future you, or future occupants of your house, might want to drill into the wall to hang shelves, etc. Bear this in mind and make sure any horizontal pipework stays lower then 300mm from the floor level. This will drastically reduce the chance of hitting the pipe when drilling at a later date.

Planning and Marking

Plan out carefully where the pipework will need to run and mark the studs or noggins where it passes them. Keep in mind that waste pipes need a slight fall along their horizontal length. Transfer the marks around to the side of the studs or noggins.

Cutting Notches

To create a notch for a standard copper water pipe, take a drill bit slightly larger than the pipe and drill through the studs and noggins, close to the front face. Cut into the stud or noggin from the front to create a notch. For waste pipes, which obviously require a larger notch, again take a drill bit slightly larger than the pipe and drill through the middle of the stud or noggin. Before cutting into the hole from the front of the timber to create the notch, cut a 300mm by 25mm section out of the front of the stud. Once the waste pipe is in place, you can screw or nail a 300mm strip of 25x50mm timber to strengthen the stud.

Click here to read more from DIY Extra