Laying Wall Foundations (Walls) Watford

Using the outer strings on the profile board as a guide, dig out 50mm of topsoil along the length of the foundation. You now need to get some lengths of 25x25mm timber to use as marker pegs.

Langley Hardware
01923 222623
32 Langley Road
Watford
Anglian Home Improvements
0800 825 0387
6 Market Street
Watford
Croxley Hardware Ltd
01923 246907
43 Baldwins Lane
Rickmansworth
Quicksharp Services
01923 262054
20 Old Mill Road
Kings Langley
Jackdaw
01923 825303
21 Maxwell Road
Northwood
Peter Sirdar Hardware Stores
01923 442700
443 Bushey Mill Lane
Bushey
Furneaux Hardware
01923 227551
79 Vicarage Road
Watford
Magnet Ltd
01923 234043
7 Caxton Way
Watford
Cowlings Hardware
020 89501664
40 High Street
Bushey
All Home Improvements
01923 330160
O 24 Sheepcot Lane
Watford
Data Provided by:
 

Laying Wall Foundations (Walls)

Any wall not built on a solid surface must have a firm and level foundation. Standard wall foundations consist of a layer of concrete on a bed of hardcore, but if the ground is particularly firm, you can get away with just a thick bed of concrete. A wall can be built directly onto a patio as long as the slabs are set on a full bed of concrete. In this article, we will look at the correct way to lay strip foundations for a wall.

Measuring and Marking Out

Work out where you want your wall to be and set up some profile boards (see diagram below) and string lines to mark your edges. This will help you keep the foundations and the wall straight. If planning a half-brick wall, your concrete foundations need to be at least 300mm wide and 150mm deep. With a one-brick wall, increase the width to 450mm and depth to 225mm. Set the outer strings of the profile board accordingly.

Note: Walls over 1m high will need deeper foundations due to the heavier load. 300mm deep is a good minimum for a wall up to about 2 metres.

profile board

Using the outer strings on the profile board as a guide, dig out 50mm of topsoil along the length of the foundation. You now need to get some lengths of 25x25mm timber to use as marker pegs. Cut these to about 450mm in length. Make a easily visible mark on each peg at 150mm and another mark 200mm. These marks will show you how deep your concrete and hardcore layers need to be so increase them accordingly if building a one-brick wall or a higher wall.

Hammer the first peg in at the edge of the foundation strip, with the marks facing inwards, until it is about 25mm below the level of the surrounding lawn or earth. Hammer the next peg in about 1m further along and use a spirit level to get it level with the first peg. Continue along the foundation strip in this way until you have marker pegs at 1m intervals along both sides. Keep checking the levels of the tops of the pegs (both along the strip and across it) as you go.

Digging the Trench

You can now start to dig out the foundation strip between the pegs, using the marks on the pegs to find the depth. Once you have a trench the full length of the strip, at the required depth (200mm from the top of the marker pegs in this case), lay down a 50mm layer of hardcore and pack it down firmly until it is reasonably level. Cover this with a thin layer of sharp sand to fill any gaps (known as a blinding).

foundation

Laying the Concrete

Mix up your concrete, either by hand for small areas or with a mixer, and shovel it into the trench. Spread the the concrete out evenly using a rake and make sure it fills all the corners and edges of the trench up to the height of the top of the marker pegs. You can use a length of wood with a straight edge to tamp it down and expel any air bubbles. You can now pull the marker pegs out and fill any gaps with concrete.

Leave it to set for a couple of hours and then cover the concrete with polythene or an old tarp and leave it to set for at least 3 days before you s...